city announced that it will receive $2 million to resurface S Wall Street from East Walnut south to East Park Street and to slim the street from 4 lanes to 2 lanes with a turn lane in the center and bike lanes on either side. the resurfacing will cover the section of Wall running south of the eastside Walgreens to about a block south of the intersection of Grand Ave. and Wall Street. projected start date is summer of 2024.
How about spending that money on resurfacing all the horrible streets we already have that are riddled with pot holes. Drive down Pleasant Hill Rd from Rt. 51 to Wall St.
ReplyDelete